DATA CENTER PARTNERS
For AI cloud
& GPU infrastructure.
Usable power with a credible approval path. We source and qualify operating hydroelectric sites for AI cloud and GPU infrastructure operators. You install and operate your own data center facilities and servers.
Share your requirementsSite sourcing is underway. No site or power capacity is currently available for contract. We also welcome requirements from hyperscalers and other data center operators.
WHAT YOU GET
The site infrastructure.
Defined around your load.
A proposed package of plant, electrical, thermal and connectivity infrastructure, qualified for each site.
Hydroelectric power
Power sized to the dam’s steady year-round output, with a defined behind-the-meter connection point, metering and operating envelope.
Closed-loop river cooling
A sealed river loop and submerged heat exchanger with no water withdrawal for cooling. Thermal capacity, low-flow limits and permits are confirmed through diligence.
Site preparation and foundations
Development areas above the site’s assessed design flood level, with loads, access, drainage and fire separation established by engineering.
A fiber route
A documented route and required easements to an identified carrier connection. Carrier contracts and backup grid service are agreed for each site.
A documented approval path
Plant authority, state power-supply rules, grid obligations, water, environmental and local approvals tracked in a permit register.
As sites are qualified, site packages will be shared under NDA. Commercial structure: site and power agreements, defined for each site.
| Party | Scope |
|---|---|
| HydroColocate | Plant and site control; plant and site permits; site preparation and foundations; behind-the-meter power to an agreed connection point; metering; the river cooling loop and submerged heat exchanger up to the heat-transfer interface; fiber route and easements; site perimeter and access. |
| Data center partner | Data center facilities; IT equipment; UPS and backup as required; coolant distribution unit (CDU) and IT cooling loop; network equipment; operations. |
| To be agreed | Carrier contracts and backup grid service. |
AN AGREED INTERFACE
Your equipment.
A defined handoff.
HydroColocate’s river loop transfers heat at the agreed heat-transfer interface. Your CDU and IT loop remain on your side of that boundary.
Electrical, thermal and network acceptance criteria become part of the site package and agreements. Responsibilities are proposed until confirmed for the site.
Explore regulation & technologyTHE PROPOSED SITE ARCHITECTURE
THE PARTNER PROCESS
Requirements first.
Evidence at each step.
Share your requirements
MW, rack density, cooling, redundancy, timing, geography and fiber needs.
Sign an NDA
Agree confidentiality before receiving non-public site materials.
Receive a matched site package
Review the power profile, cooling envelope, fiber and approval status.
Visit the site and run diligence
Validate engineering interfaces, operational requirements and the approval path.
Sign the site and power agreements
Document the agreed scope, responsibilities and conditions to proceed.
Inside a site package.
A one-page template of the information a partner receives. Blank fields only; no actual site data.
PARTNER FAQ